☾ PakistanSign in
Back to opportunitiesBrowse historical notices
Tender

SSGC/SC/GLP/EPAD/14533Engineering Survey of Pipeline Route and Mapping Work 8" Dia X 2.5 Kms Gas Pipeline Project from Hatim Gas Field to Mva Lundo (As Per /BOQ) (Having Valid PEC Certificate Category C-6 or Above)(Valid Certification ISO 9001, ISO 14001 and OHSAS 45001) (Under Single Stage One Envelope Bidding Procedure)(as Per PPRA Rules 2026 Clause # 31 Gallop Tendering)(On Complete Package Basis).

Ministry of Energy (Petroleum Division)·Karachi, Sindh

Closed · Reference: SSGC/SC/GLP/EPAD/14533

Listed deadline
Published

Published source: PPRA Federal

Tenderdesk is a discovery service. Verify requirements and amendments with the publisher.

Last public update:

Browse current tenders
Opening dateNot statedAs stated in the notice
Bid securityNot statedAs stated in the notice
Estimated valueNot statedPakistani rupees
Document feeNot statedConfirm with the original notice
Procurement methodNot statedAs stated in the notice

The opportunity

SSGC/SC/GLP/EPAD/14533

SSGC/SC/GLP/EPAD/14533Engineering Survey of Pipeline Route and Mapping Work 8" Dia X 2.5 Kms Gas Pipeline Project from Hatim Gas Field to Mva Lundo (As Per /BOQ) (Having Valid PEC Certificate Category C-6 or Above)(Valid Certification ISO 9001, ISO 14001 and OHSAS 45001) (Under Single Stage One Envelope Bidding Procedure)(as Per PPRA Rules 2026 Clause # 31 Gallop Tendering)(On Complete Package Basis). Engineering Survey of Pipeline Route and Mapping Work 8" Dia X 2.5 Kms Gas Pipeline Project from Hatim Gas Field to Mva Lundo (As Per /BOQ) (Having Valid PEC Certificate Category C-6 or Above)(Valid Certification ISO 9001, ISO 14001 and OHSAS 45001) (Under Single Stage One Envelope Bidding Procedure)(as Per PPRA Rules 2026 Clause # 31 Gallop Tendering)(On Complete Package Basis). Engineering Survey of Pipeline Route and Mapping... Civil Works SSGC/SC/GLP/EPAD/14533

Requirements in the notice

Requirements not stated in the public summary.

Use this summary to shortlist opportunities. The original notice remains authoritative for eligibility, scope and deadlines.